Interdisciplinary Collaboration: Collaborated between the development team, construction arm, and site personnel to minimize miscommunication and improve project flow.
On-Site Coordination: Acted as a liaison during the construction phase of in-house developments, providing oversight to ensure site activities aligned with architectural specifications.
BIM Integration: Maintained "live" 3D models in Archicad to house services and subcontractor inputs, ensuring that drawings remained coordinated and reflected real-time site conditions.
Construction Detailing: Developed technical details to resolve complex junctions, ensuring that design intent is translated into buildable onsite solutions.
Technical Documentation: Produced architectural drawing sets and ensured project documentation maintained compliance with local building codes.